TM 10-3930-222-20
Table 1. Maintenance Indicator Checklist--Continued.
Item
Interval
Par.
No.
M
S
Procedure
ref.
normal operating speed.
d. The fuel gage should register full.
e. The hour meter should operate as soon as the engine is operating.
f. The transmission temperature gage will indicate red if trans-
mission exceeds safe operating range.
g. The horn should be audible for a distance of 300 feet.
h. Check all switches for efficient operation, secure mounting, and
positive operation.
43
x
x
Engine.
Observe engine operating characteristics, such as noise, engine
knocks, and rattles while the engine is accelerated and decelerated.
44
x
Fuel Pump.
a. Inspect the fuel pump for leaks and other defects
45
x
Governor.
Adjust governed speed to 2,400 rpm without load and 2,200 rpm
with full load.
46
x
Ignition Timing.
Check ignition timing. Adjust the timing as necessary.
47
x
Compression Test.
a. Perform a compression test.
b. Remove and completely service spark plugs. Adjust gap to 0.030
inch, and torque plugs to 10 to 20 foot-pounds.
48
x
Vacuum Test.
Perform a vacuum test and adjust carburetor.
49
x
Voltage Regulator.
Check the voltage regulator for proper voltage output of 13.8 to
14.8 volts, and proper current output of 17.5 to 20.8 amperes.
50
x
Steering.
With engine turned off, install pressure gage in proper opening
on relief valve (located in flow divider). Operate engine at 600 rpm
steer wheels to extreme right or left and hold them in this position,
and check line pressure. The pressure reading should be 1,200 psi.
51
x
x
Main Hydraulic Pump.
Inspect the main hydraulic pump for leaks. Be certain that it is
mounted securely.
52
x
Main Hydraulic Pump.
With engine turned off, install pressure gage at the proper open-
ing in the control valve. Operate engine at top governed speed, tilt
mast assembly against rear stops, and check output pressure reading.
The proper reading's 1,800 psi.
53
x
x
Hydraulic Cylinders.
a. Lift Cylinder. Place a 15,000-pound load on the forks, and
raise load from ground level to a lift height of 210 inches. The load
should reach this height it in approximately 22 seconds. Lower the
load to 4 or 5 feet above ground level. Hold load in this position for
5 minutes. At the end of 5 minutes, the load should not have drifted
more than 1 inch. Check cylinder for leaks.
b. Tilt Cylinders. Tilt the load at the lift height of 210 inches.
Perform this operation several times and note any malfunctioning.
Check cylinders for leaks. Tilt should not exceed 3o forward or 10o
backward from center.
39
|