Click here to make tpub.com your Home Page

Page Title: Section II. FRAME AND TOWING ATTACHMENT MAINTENANCE PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-673-34
13
Section II.
FRAME AND TOWING ATTACHMENT MAINTENANCE PROCEDURES
13-3. FRAME ASSEMBLY REPAIR
This Task Covers:
a. Disassembly
c. Inspection
b. Cleaning
d. Assembly
INITIAL SETUP
Equipment Condition (Cont)
Tools and Special Tools
Boom assembly removed (Para 16-11)
Tool Kit, General Mechanic's: Automotive
Front axle removed (Para 8-3)
(Item 23, Appendix D)
Rear axle removed (Para 9-3)
Shop Equipment, Machine Shop: Field
Maintenance Basic, Less Power
Materials/Parts
(Item 19, Appendix D)
Bushing
Tool Kit, Body and Fender Repair
Conduit (2)
(Item 22, Appendix D)
Conduit
Equipment Condition
Conduit
Engine door panels removed
Hinge
(TM 10-3930-673-20)
Engine removed (Para 3-3)
References
Transmission removed (Para 7-4)
TM 9-237
Cab assembly with ROPS/FOPS removed
a. Disassembly.
(1)
Remove two conduits (1) from
frame (2). Discard conduit.
(2)
Remove conduit (3) from frame (2).
Discard conduit.
(3)
Remove conduit (4) from frame (2).
Discard conduit.
TR00001
(4)
Remove two hinges (5) from
3
frame (4).
6
(a)
Measure location of hinge (5) in
frame cutout for door. Record
location.
(b)
Break welds attaching hinge (5) to
frame (2).
(c)
Remove hinge (5) from frame (2).
Discard hinge.
4
2
(d)
Use a grinder or file to remove old
weld material from frame (2).
1
5
(5)
Remove bushing (6) from frame (2).
TR01018

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business