Click here to make tpub.com your Home Page

Page Title: Section II. TRANSMISSION MAINTENANCE PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-673-34
7
Section II.
TRANSMISSION MAINTENANCE PROCEDURES
7-3. TORQUE CONVERTER REPLACEMENT/REPAIR
This Task Covers:
a. Removal
c. Cleaning
e. Assembly
b. Disassembly
d. Inspection
f. Installation
INITIAL SETUP
Materials/Parts
Tools and Special Tools
Compound, Sealing (Item 39, Appendix B)
Tool Kit, General Mechanic's: Automotive
Compound, Sealing (Item 41, Appendix B)
(Item 23, Appendix D)
Oil, Hydraulic (Item 30, Appendix B)
Shop Equipment, Automotive Maintenance,
Rags, Lint-free (Item 34, Appendix B)
Common No. 2 Less Power
(Item 17, Appendix D)
Packing, Preformed
Bearing Puller (Item 15, Appendix D)
Packing, Preformed
Starwasher (12)
Equipment Condition
Transmission output shaft removed (Para 7-6)
a. Removal.
(1)
Remove nut (1), washer (2), and
yoke (3) from torque converter (4).
(2)
Remove 12 nuts (5), starwashers (6),
screws (7), and torque converter
cover (8) from transmission
housing (9). Discard starwashers.
(3)
Remove torque converter (4) from
transmission housing (9) and place
on a clean workbench with front
cover facing up.
b. Disassembly.
(1)
Remove parts (10 through 13) from
torque converter cover (8).
TR00188

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business