|
|
b. Disassembly.
between roller and channel, but will not pass 3/16 inch
stock.
(1) Remove rod end (1, fig. 12-4) secured with
(4) At installation, tighten chain nuts (20) to take
nut (2), screw (3) and washer (4).
slack from both chains at the same time, back off both
(2) Remove packing retainer (5) attached with
nuts 1/16 inch and lock in place with nuts (21).
two screws (6) and washers (7). Remove wiper ring (8)
d. Repair.
from inside packing retainer.
(3) Unscrew stuffing box (10) and remove
(1) Replace any part which probably will not
packing set (9) and packing (11) from stuffing box.
remain serviceable until next scheduled overhaul.
(4) Pull piston and rod assembly (13) from
(2) By cold working only, align all parallel
cylinder (14). Packing (12) will come out with piston and
surfaces of the uprights, in three dimensions, to within
rod assembly. Remove packing (12) from piston and
1/4 inch. Do not heat.
rod assembly.
(5) Wearing parts of the tilt cylinders are hard
12-5.
Tilt Cylinder Repair
chrome plated.
Replace cylinders or piston rods
showing scoring, scratches or wear through the plating.
a. Removal, Adjustment and Installation.
Refer to
Do not hone to repair. Replace all nonmetallic parts.
(TM 10-3930-627-12).
Figure 12-4. Tilt cylinder, exploded view.
12-7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |