|
|
TM 10-3930-673-34
16-12. INNER BOOM REPLACEMENT/REPAIR (CONT)
NOTE
Ropes will be used to pull extend chain, electrical cable, and three hydraulic hoses
through boom when inner boom is installed.
(1)
Place two ropes inside length of intermediate boom.
(2)
At front of intermediate boom, attach one rope to extend chain and other rope to
electrical cable and three hydraulic hoses.
(3)
Using another forklift, move inner boom to position in front of and in alignment with
intermediate boom of vehicle. Place on jackstands or suitable supports.
f. Installation.
NOTE
Ropes will be used to pull extend chain, electrical cable, and three hydraulic hoses
through boom when inner boom is installed.
(1)
Place two ropes inside length of intermediate boom.
(2)
At front of intermediate boom, attach one rope to extend chain and other rope to
electrical cable and three hydraulic hoses.
(3)
Using another forklift, move inner boom to position in front of and in alignment with
intermediate boom of vehicle. Place on jackstands or suitable supports.
(4)
Using overhead lifting device, other forklift and lifting straps or chains, carefully raise
inner boom and push inner boom inside intermediate boom approximately 2 ft (610
mm).
NOTE
Overhead crane can remain in position for safety.
16-68.2
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |