Click here to make tpub.com your Home Page

Page Title: INNER BOOM REPLACEMENT/REPAIR - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-673-34
(5)
Lower overhead crane
slightly to put slack in lifting
straps or chains. Keep straps
or chains in position around
inner boom.
NOTE
Perform steps 6 and 7 for each of
two wear pads.
(6)
At inside of intermediate
boom (39) position three
shims (88), spacer (87), three
inserts (86), and wear pad
(50).
TR01691
(7)
Apply sealing compound to
threads of two bolts (47) and
secure wear pad (50) to inner
boom (9) with two washers
(49), new lockwashers (48),
and bolts (47). Tighten bolts to
30 lb-ft (40.67 Nm).
(8)
Install sheave (54) to
intermediate boom (39) with
chain sheave pin (53). Install
new lockwasher (52) and bolt
(51).
(9)
Apply sealing compound to
threads of remaining bolt (47)
and install washer (49) new
lockwashers (48) and bolt ().
tighten bolt to 30 lb-ft (40.67
Nm).
(10) Install top and side wear pads
of intermediate and outer
(11) Position clevis (92) and
retract chain (89) into hole
underneath intermediate
boom (39).
Change 1
16-68.3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business