|
|
TM 10-3930-673-34
16
This Task Covers:
a. Disassembly
c. Inspection
b. Cleaning
d. Assembly
INITIAL SETUP
Materials/Parts
Tools and Special Tools
Oil, Lubricating, Transmission/Hydraulic
Tool Kit, General Mechanic's: Automotive
(Item 30, Appendix B)
(Item 23, Appendix D)
Rags, Lint-free (Item 34, Appendix B)
Shop Equipment, Automotive Maintenance,
Packing, Preformed
Common No. 2 Less Power
Packing, Preformed
(Item 17, Appendix D)
Packing, Preformed
Packing, Preformed
Equipment Condition
Packing, Preformed
Boom cylinder flow control valve removed
Packing, Preformed
(TM 10-3930-673-20)
Packing, Preformed
Main control valve assembly removed
Packing, Preformed
(TM 10-3930-673-20)
Packing, Preformed
Packing, Preformed
Packing, Preformed
Packing, Preformed
Packing, Preformed
a. Disassembly.
NOTE
Do not remove main relief valves
unless they are being replaced.
Top and bottom main relief valves
are removed and disassembled
the same way bottom main relief
valve is shown.
(1)
Remove two main relief valves (1)
and disassemble parts (2 through 19)
TR00990
from main control valve.
(a)
Remove nuts (2 and 3) and
preformed packings (4) from adjusting screw (5). Discard preformed packings.
NOTE
Count and record number of turns required to remove adjusting screw to aid in assembly.
(b)
Remove adjusting screw (5), spring (6), and poppet (7) from plug (8).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |