|
|
TM 10-3930-673-34
TR00189
(3)
Install turbine (28), parts (24 through 27), front cover (17), and parts (14 through 18).
(a)
Install turbine (28) and turbine hub (25) on impeller (18).
(b)
Install inner thrust race (24), needle thrust bearing (23), and outer thrust race (22) on turbine
hub (25).
(c)
Install bearing (26) 0.040 in. (1.02 mm) below thrust race (22) surface on input shaft (16).
(d)
Install preformed packing (27) on front cover (17).
(e)
Align marks made at disassembly between front cover (17) and impeller (18). Install front
cover.
WARNING
Adhesives, solvents, and sealing compounds can burn easily, can give off harmful vapors,
and are harmful to skin and clothing. To avoid injury or death, keep away from open fire
and use in a well-ventilated area. If adhesive, solvent, or sealing compound gets on skin
or clothing, wash immediately with soap and water.
(f)
Apply sealing compound to threads of screws (21). Install 20 screws (21), washers (20), and
nuts (19). Tighten screws to 25 lb-ft (33.9 Nm).
(g)
Install converter input shaft (16). Apply sealing compound to threads of screws (14). Install
12 lockwashers (15) and screws. Tighten screws to 30 lb-ft (40.7 Nm).
7-7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |