|
|
TM 10-3930-673-20-2
6
This Task Covers:
a. Removal
b. Installation
INITIAL SETUP
Materials/Parts
Tools and Special Tools
Tie Wraps (Item 41, Appendix C)
Tool Kit, General Mechanic's: Automotive
Lockwashers (4)
(Item 18, Appendix F)
Equipment Condition
Negative battery cable disconnected
Fork autoleveler switch removed (Para 8-19)
a. Removal.
(1)
Tag, mark, and remove 28 electrical wires (1)
on two terminal strips (2 and 3) of boom
electrical junction box (4).
(a)
Tag and mark 28 electrical wires (1) on
two terminal strips (2 and 3) in boom
TR00004
electrical junction box (4).
2
6
3
(b)
Loosen 28 screws (5) on two terminal
strips (2 and 3) and remove electrical
wires (1).
1
(c)
Remove screw (6) and electrical wire (1)
from boom electrical junction box (4).
5
1
4
NOTE
Remove tie wraps as necessary.
4
(2)
Tag, mark, and remove boom electrical cable
(7) from boom electrical junction box (4).
(3)
Tag, mark, and remove eight electrical cables
8
(8) from boom electrical junction box (4).
7
TR00341
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |