|
|
TM 10-3930-660-24-2
PISTON PUMP MAINTENANCE
THIS WORK PACKAGE COVERS
Disassembly, Cleaning, Inspection, Assembly
INITIAL SETUP
Tools and Special Tools
Materials/Parts - Continued
O-ring (5, 32 and 46)
Tool kit, general mechanic's (Item 39, WP 0324 00)
Shop equipment, automotive maintenance (Item 21,
References
Driver, group (Item 9, WP 0324 00)
TM 10-3930-660-10
Materials/Parts
Rag, wiping (Item 40, WP 0323 00)
Equipment Condition
Piston pump removed (WP 0174 00)
Gasket (4 and 10)
DISASSEMBLY
NOTE
Clean outside surfaces of the valve block and compensator before disassembly.
1.
Remove four screws (2) and pull compensator (1)
1
from valve block (3).
4
2.
Remove gasket (4) and O-ring (5) from compensator
(1). Discard gasket and O-ring.
6
2
3.
Remove rotating group parts from housing (6) and
5
valve block (3).
3
409-4101
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |