Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-1
BOOM HOIST CYLINDER REPLACEMENT - CONTINUED
0201 00
INSTALLATION - CONTINUED
NOTE
Have assistant signal operator when rod eye of cylinder is aligned with boom pivot pin hole.
If installing both cylinders at the same time, note that in step 5 one cylinder will extend and the other will
remain stationary.
Cylinder that has extended must be aligned and then secured to boom with pivot pin.
When cylinder that extended is secured to boom, other cylinder will respond to controls, and can be
extended as well.
5.
Start engine and run at full throttle (TM 10-3930-660-10).
6.
Extend cylinder rod until upper pivot pin (1) can be installed. Reposition cylinder (2), as necessary, using lifting device.
7.
Stop engine (TM 10-3930-660-10).
NOTE
1
Apply antiseize compound to upper pivot
3
pin as installed.
4
8.
Install upper pivot pin (1), screw (4) and new locknut
(3).
9.
Disconnect lifting device from cylinder (2) and boom.
2
Remove board from across vehicle deck.
10.
To bleed air from hydraulic system, start engine (TM
409-791
10-3930-660-10).
11.
Operate boom hoist functions. Raise and lower boom five times (TM 10-3930-660-10).
12.
Stop engine and relieve hydraulic pressure by operating boom hoist functions of hydraulic joystick (TM 10-3930-660-
10).
13.
Install transmission cover (WP 0150 00).
END OF WORK PACKAGE
0201 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business