|
|
TM 10-3930-660-24-1
TRANSMISSION SHIFTER MAINTENANCE
THIS WORK PACKAGE COVERS
Removal, Installation, Adjustment
INITIAL SETUP
Materials/Parts - Continued
Tools and Special Tools
Locknut (8 and 24)
Tool kit, general mechanic's (Item 39, WP 0324 00)
Lockwasher (20, 27 and 30)
Materials/Parts
Equipment Condition
Grease, GAA (Item 20, WP 0323 00)
Vehicle parked on level ground (TM 10-3930-660-
10)
Tag, marker (Item 57, WP 0323 00)
Left-hand instrument panel separated from front
console and shifter (WP 0067 00)
Cotter pins (5, 13 and 34)
NOTE
Tag all electrical connections before removing for use during installation.
REMOVAL
1.
To lift transmission shifter (1) out of front console (2),
1
remove transmission cable assemblies (3 and 4) from
shifter (1).
2.
Remove cotter pins (5) and washers (6) securing uni-
versal swivels (7) of cable assemblies (3 and 4) to
3 11
shifter (1). Discard cotter pins.
3.
Remove locknuts (8) and clamps (9) securing cable
4
assemblies (3 and 4) to shifter (1). Discard locknuts.
10,12
4.
Remove cable assemblies (3 and 4) from shifter (1).
5.
Disconnect two electrical leads (10) of back-up alarm
switch (11) from vehicle wiring harness (12).
6.
Raise and remove shifter (1) from front console (2).
2
6
7
7
3
5
4
8
9
8
9
409-4119
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |