|
|
TM 10-3930-660-24-1
COOLANT OVERFLOW TANK REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Tools and Special Tools
Materials/Parts - Continued
Locknut (3)
Tool kit, general mechanic's (Item 39, WP 0324 00)
Equipment Condition
Materials/Parts
Vehicle parked on level ground (TM 10-3930-660-
Antifreeze (Item 6, WP 0323 00)
10)
Engine off and cool (TM 10-3930-660-10)
Container, 2 qt
REMOVAL
1.
Place container under tank (1).
2.
Disconnect hose (2) from bottom of tank (1) and allow
coolant to drain from tank.
3.
Remove four locknuts (3), four flatwashers (4), clamp
(5) and coolant overflow tank (1). Discard locknuts.
INSTALLATION
1.
Position clamp (5) around discharge hose (6) of tank
(1).
2.
Position tank (1) on vehicle and install four flatwash-
ers (4) and four new locknuts (3).
3.
Connect hose (2) to bottom of tank (1).
1
6
4
2
3
4
5
409-1924
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |