Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

5-42C.
INSTALLATION
Remove the flywheel from the vise
a.
and place it on a flat surface with the
side the ring gear slips over face up
(refer to Figure 5-48C).
Position ring gear on
the fly-
b.
and
wheel and heat with a oxygen
: REFER
acetyline mix torch (CAUTION
S E C T I O N S 5-15,
5-16 and
5-17 FOR SAFETY PRECAUTIONS.)
C.
Using a circular motion,heat
flywheel ring gear until it falls
into its place on the flywheel.
d.
Let the ring gear cool on its
DO NOT IMMERSE IN WATER.
own.
5-34B

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business