|
|
Figure 4-33. Pressure Bleeder Hook-up
h. When air bubbles stop coming into the
k . When bleeding operation is completed, fill
container, close the bleeder fitting and remove the
both cylinders to within l/4 inch from the top.
tube. Close bleeder tank valve.
i. Disconnect bleeder tank line from master
cylinder and connect it to the inching master
cylinder.
Always relieve pressure from bleeder tank
j. Follow the same procedure as outlined above,
when bleeding operation is completed.
but start at bleeding point "A," shown in figure
4-36.
4-21. MANUAL BLEEDING. Manual bleeding
4-24
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |