|
|
TM 10-3930-638-24&P
4-2. ENGINE MAINTENANCE (cont)
g. Camshaft and Bearings.
This task covers replacement of the camshaft and bearings consisting of:
d. Inspection and Repair
a. Removal
e. Reassembly
b. Disassembly
f. Installation
c. Cleaning
INITIAL SETUP
EQUIPMENT CONDITION
TOOLS
Paragraph
Condition Description
Metal Rod, 1/2 inch diameter by 4 feet long
Exhaust manifold removed.
Clothespins
Water pump removed.
Wooden Dowels, 3/8 inch diameter by 12 inches long
Fuel injector fittings disconnected.
(eight required)
Rocker arm assembly removed.
Micrometer, zero to 5 inches
Tachometer drive removed.
Bore Gage, zero to 5 inches
Oil pan removed.
Asbestos Gloves
Timing gear cover removed.
Dial Indicator
Flywheel and flywheel housing removed.
Gear and Bearing Heater
NSN 4910-00-754-0654
Crankshaft removed.
No. 1 Common Organiza-
tional Maintenance Tool Kit
SPECIAL TOOLS
Camshaft Bushing Tool Kit
FSCM 10988 P/NA41 103
MATERIALS/PARTS
Cleaning solvent P-D-680
Clean cloths
Oil, No. 30
KEY
1. Thrust plate
bolts
2. Lock washers
3. Valve tappet
4. Camshaft nut
5. Lock
6. Camshaft gear
7. Key
8. Camshaft thrust
plate
9. Camshaft
10. Front camshaft
bushing
11. Center and
intermediate
camshaft bushings
12. Rear camshaft
bushing
13. Cup plug
14. Push rods
4-52
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |