|
|
TM 10-3930-638-24&P
4-2. ENGINE MAINTENANCE
a. Cylinder Block Assembly.
This task covers repair of the cylinder block assembly consisting of:
a. Disassembly
c. Inspection
b. Cleaning
d. Reassembly
INITIAL SETUP
TOOLS
EQUIPMENT' CONDITION
Brass Wire Probe
Paragraph
Condition Description
Wire, .020 inch diameter
Cylinder head assembly removed.
NSN 5210-00-221-1999
Thickness Gage
Oil Dan removed.
FSCM 45225
Steel Straight Edge
Timing gear cover removed.
P/N CAS-1369A
Oil pump removed.
Micrometer, zero to 5 inches
Flywheel and flywheel housing removed.
NSN 4240-00-269-7912
Industrial Goggles
Crankshaft oil seal retainer removed.
Bore Gage, zero to 5 inches
Crankshaft and main bearings removed.
Plasti gage
Pistons and connecting rod removed.
NSN 4910-00-754-0654
No. 1 Common Organiza-
Camshaft and bearings removed.
tional Maintenance Tool Kit
Sleeve, 3-3/16 inches diameter
Sleeve, 3/4 inch diameter
Sleeve, 1 inch diameter
SPECIAL TOOLS
FSCM 10988 P/N A40682
Clamping Bar
FSCM 10988 P/N A28312
Ball
FSCM 10988 P/N A142802
Clamping Disc
MATERIALS/PARTS
Paint
Cleaning solvent P-D-680
Clean cloths
Blue Vitriol solution
O-rings
Oil, No. 30
Dry ice
REMARKS
ACTION
ITEM
LOCATION
STEP
DISASSEMBLY
NOTE
Remove cylinder sleeves only if inspection indicates removal/
replacement is necessary.
Number and mark for position in relation
a. Identify
a. Cylinder sleeve (1)
Cylinder
1
to block if sleeves may be reinstalled.
block (1 9),
Use paint
top
4-2
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |