|
|
TM 10-3930-638-24&P
3-20. AXLES AND DIFFERENTIAL CARRIER ASSEMBLIES MAINTENANCE
a. Front Axle Assembly.
This task covers:
a. Removal
b. Installation/Replacement
INITIAL SETUP
EQUIPMENT CONDITION
TOOLS
Paragraph
NSN 4910-00-754-0654
No. 1 Common Organiza-
Condition Description
Vehicle parked on level surface, engine
tional Maintenance Tool Kit
Jack Stands, 4 ton capacity (2)
off, rear wheels blocked, and parking
brake applied.
Chain Hoist, 10 ton capacity
Roller Jack, one ton capacity
Shipping lock pin installed.
Front drive shaft assembly disconnected
Hard Wooden Block (2),
from front axle assembly differential
6 by 6 by 18 inches
companion yoke.
Front chassis raised (use chain hoist) and
MATERIALS/PARTS
securely blocked (use jack stands).
Hose (FSCM 81343 P/N SAE30R2TYPE1-1-41D)
Front wheels and tires removed.
Brake hoses, lines and fittings discon-
nected from front axle assembly housing
and wheel cylinders.
3-138
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |