|
|
1
Chain, cable
5
Washer, spherical
2
Nut, stop
6
Nut, stop
3
Pin, with cotter pins
7
Pin, cotter
4
Anchor, chain
Figure 104. Cable chain
(7) Using suitable hoist, remove upright
(9) Repeat procedure in (5) through (8)
assembly from truck.
above to remove other roller and
sheave.
(10) Remove snap ring (17) and upright
b.
Disassembly.
roller (16) from inner upright.
(11) Remove shim (13), snap ring (14) and
(1)
Remove chains (par. 70).
bearing (15) from inner upright.
(2)
Remove carriage (par. 68).
(3)
Remove hoist cylinder (par. 67).
c.
Inspection.
(4)
Separate inner and outer uprights.
(5)
Remove retaining ring (3, fig. 105),
(1) Clean all parts except bearing in SD.
shims (1), and load roller (2) from
(2) Inspect rollers for wear and out of
upright.
round.
(6) Remove capscrew (4), lockwasher (5),
and keeper (6) from upright frame.
(3) Inspect bearings for wear.
(7) Slide pin (7) from upright and remove
d.
Assembly and Adjustment.
sheave (11) and washers (8).
(8) Remove bearings (9) and retaining
rings (10) from sheave.
AGO 7010A
125
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |