Quantcast Hydraulic Tilt Cylinder - TM-10-3930-634-340208

 

Click here to make tpub.com your Home Page

Page Title: Hydraulic Tilt Cylinder
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
CHAPTER 6 REPAIR OF MAIN HYDRAULIC SYSTEM
Up
TM-10-3930-634-34 Truck Lift Fork; Diesel Engine Pneumatic Tired Wheels Rough Terrain 6 000 Lb. Capacity 24 Load Center Anthony Model MIT 6-2 Manual
Next
Piston leakage test.
TM 10-3930-634-34
driver's seat to gain access to the valve.
6 - 5 . Hydraulic Tilt Cylinder
(2) Tag and disconnect tubing and hoses, and cap
a. Removal.
all openings to prevent the entrance of dirt.
(1) Raise mast assembly and block with supports
(3) Refer to figure 6-5 and remove the dual over-
provided. Tilt forks to their full down position and dis-
center relief and replenishing valve.
connect and cap hydraulic lines.
b. Disassembly. Refer to figure 6-6 and disassemble
( 2 ) Refer to figure 6-7 and remove tilt cylinder.
the relief and replenishing valve.
b. Disassembly, Refer to figure 6-8 and disassemble
c. Cleaning and Inspection.
the hydraulic tilt cylinder.
(1) Clean all parts thoroughly, using solvent
c. Cleaning and Inspection.
P-D-680 or equal.
(1) Clean all metal parts thoroughly using solvent
(2) Inspect all parts for cracks, breaks, and burrs.
P-D-680 or equal. Dry thoroughly.
(3) Inspect all threads for damage.
(2) Inspect parts for wear, scoring, scratches,
(4) Replace defective parts.
nicks and burrs.
d. Reassembly. Refer to figure 6-6 and reassemble
(3) Inspect cylinder body for cracks.
the dual overcenter relief and replenishing valve.
(4) Replace defective parts.
e. Installation.
d. Reassembly. Refer to figure 6-8 and reassemble
(1) Refer to figure 6-5 and install the dual over-
the hydraulic tilt cylinder.
center relief and replenishing valve.
NOTE
(2) Remove caps and reconnect hoses and tubing.
Upon reassembly, use new packing. Torque
(3) Reinstall the console panel.
the rod end nut to 900-100 lb-ft torque, as
NOTE
specified in paragraph l-7b(8).
The dual relief valve is adjusted to
e. Test.
2100-2400 psi. The overcenter relief valve is
(1) Packing drag test.
adjusted to 3000 psi.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.