|
|
TM 10-3930-673-34
f. Installation.
NOTE
Remove caps and plugs as hoses are
installed. Wipe all sealing surfaces on
valve and hoses clean and dry. Apply film
of clean hydraulic oil to all seals as they
are installed.
(1)
Install boom extend cylinder (2) parts (9
through 22).
WARNING
TR01766
Use care when installing snap and
retaining rings. Snap and retaining rings
are under spring tension and can act as
projectiles when released and could cause
severe eye injury.
(a)
Apply anti-seize compound to shaft (16). Install shaft, two snap rings (15), and extend cylinder anchor (14)
on boom extend cylinder (2).
(a.1) Install sealing compound on threads of two screws (21).
(b)
Install wear pad (17) and two screws (21) on buckling brace (22). Tighten screws to 10 lb-ft (14 Nm).
(c)
Install buckling braces (20 and 22), two screws (19), and two nuts (18) on boom extend cylinder (2).
(d)
Use a sling and hoist to install boom
extend cylinder (2) at back of boom.
(e)
Have an assistant guide boom extend
cylinder (2) and slide it into boom.
WARNING
Use care when installing snap and
retaining rings. Snap and retaining rings
are under spring tension and can act as
TR01764
projectiles when released and could cause
severe eye injury.
(f)
Apply anti-seize compound to shaft (10). Install shaft and snap ring (9) in inner boom (11).
(g)
Place wood blocks underneath boom extend cylinder (2) and inner boom (11).
(h)
Remove hoist and sling from back of boom extend cylinder (2).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |