Click here to make tpub.com your Home Page

Page Title: INTERMEDIATE BOOM REPLACEMENT/REPAIR
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-673-34
16
16-13. INTERMEDIATE BOOM REPLACEMENT/REPAIR
This Task Covers:
a. Removal
c. Cleaning
e. Assembly
b. Disassembly
d. Inspection
f. Installation
INITIAL SETUP
Materials/Parts
Tools and Special Tools
Compound, Sealing (Item 40, Appendix B)
Tool Kit, General Mechanic's: Automotive
Tags (Item 55, Appendix B)
(Item 23, Appendix D)
Lockwasher (4)
Shop Equipment, Automotive Maintenance and
Lockwasher (4)
Repair, Field Maintenance Basic, Less Power
Lockwasher (6)
(Item 18, Appendix D)
Container, 5 gal (19 l) capacity
Cap and Plug Set (Item 1, Appendix D)
Wood Blocks
Lifting Device, 1 ton (907.18 kg) capacity
Personnel Required
Equipment Condition
Two
Boom level (TM 10-3930-673-10)
Inner boom removed (Para 16-12)
a. Removal.
WARNING
Intermediate boom weighs 955 lbs (433.18 kg). Attach suitable lifting device prior to removal or
installation to prevent possible injury to personnel.
NOTE
Ensure that rope used during inner boom removal (Para 16-12) is placed in intermediate boom and
fastened at each end.
(1)
Position another forklift vehicle in front of and facing vehicle.
(2)
Using lifting straps, secure front of intermediate boom to carriage of other forklift vehicle.
(3)
Using other forklift, slightly raise intermediate boom to gain access to bottom wear pads on inside of outer
boom.
Change 1
16-69

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business