Click here to make tpub.com your Home Page

Page Title: AIR CONDITIONING SYSTEM SERVICING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-673-34
15-3. AIR CONDITIONING SYSTEM SERVICING (CONT)
a. Manifold Gage Set Installation.
(1)
Turn high pressure gage valve (2) and
low pressure gage valve (1) on gage set (3)
clockwise to their front seated (closed)
positions.
(2)
Remove two dust caps (8) from service
valve ports (6) and (7).
WARNING
Make sure hand valves on manifold
gage set are in closed position
during connection, and hoses are
clear of any moving parts in engine
compartment. Injury to personnel or
damage to equipment may result.
(3)
Connect low pressure gage hose (5) on
manifold gage set (3) to suction (low side)
service valve port (6).
(4)
Connect high pressure gage hose (4) on
manifold gage set (3) to discharge (high
side) service valve (7).
(5)
Hang manifold gage set (3) so that
hoses (5) and (4) are well away from
moving engine parts.
NOTE
Do not perform step (6) if system is
already evacuated. High and low
pressure hoses must be purged with
refrigerant for charging purposes
(refer to task e.).
7
(6)
Loosen low pressure gage hose (5) and
high pressure gage hose (4) at manifold
gage set slightly for a second to purge air
from hoses, and then tighten.
9
8
6
15-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business