Click here to make tpub.com your Home Page

Page Title: FRONT DIFFERENTIAL CARRIER ASSEMBLY REPLACEMENT/REPAIR/ADJUSTMENT - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-673-34
CAUTION
Ring gear must be heated before
installation. Failure to heat ring
gear before installation could cause
damage to differential case half
because of tight fit.
(10) If removed, install ring gear (13).
(a)
Expand ring gear (13) by heating in
a tank of water to a temperature of
160F - 180F (71C - 82C) for 10 to
15 minutes.
TR00258
WARNING
Wear gloves and proper clothing while handling hot ring gear. Failure to follow this
precaution could result in serious personal injury.
(b)
Use a sling and hoist to lift the ring gear (13) from tank of water.
(c)
Install ring gear (13) on flange case half (26) immediately after heating. If ring gear does not
fit easily on flange case half, repeat Step (a).
(d)
Align fastener holes of ring gear (13) and flange case half (26) by rotating ring gear as needed.
CAUTION
Do not heat rivets before
installation. Hot rivets could
damage ring gear and flange case
half.
(e)
Properly install 12 rivets (27) in
pairs opposite each other (A and B)
from the flange case half (26) side of
the assembly (side opposite gear
teeth).
(f)
Use a riveting machine to press
rivets (27) into place from ring
gear (13) side of the assembly. Press
rivets in pairs opposite each other.
Apply 60,000 lb of pressure.
TR00265
8-21

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business