Click here to make tpub.com your Home Page

Page Title: ARCTIC HEATER REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-673-20-2
18
20-2. ARCTIC HEATER REPLACEMENT
This Task Covers:
a. Removal
b. Installation
INITIAL SETUP
Materials/Parts
Tools and Special Tools
Container, 1 gal (3.8 l) capacity (2)
Tool Kit, General Mechanic's: Automotive
(Item 18, Appendix F)
Equipment Condition
Negative battery cable disconnected (Para 8-44)
Engine cooling system drained (Para 7-2)
a. Removal.
(1)
Close coolant valve (1) on left side of engine.
NOTE
Tag or mark hoses for ease in
installation.
Clamp each of two hoses closed to prevent
coolant loss when hoses are disconnected.
(2)
Loosen hose clamp (2) and disconnect heater
outlet hose (3) from heater assembly (4).
(3)
Loosen hose clamp (5) and disconnect heater
inlet hose (6) from heater assembly (4).
(4)
Disconnect large circular connector (7) of
heater wiring harness (8) from heater
assembly (4).
TR00883
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business