|
|
TM 10-3930-673-20-2
(5)
Install chain clevis (2) on boom (1).
1
Install chain clevis (2) on boom (1) with washer
(4) and nut (3). Tighten nut (3) until locknut (5)
is tight against boom (1).
(6)
Check/adjust chain adjustment (Para 18-23).
(7)
Check/adjust hydraulic hoses and electrical
cable (Para 18-24).
3
2
4
5
TR00688
c. Extend Chain Pulley Removal.
(1)
Fully retract, then extend boom (1) several
inches (TM 10-3930-673-10).
WARNING
Use care when removing snap and
retaining rings. Snap and retaining rings
are under spring tension and can act as
projectiles when released and could cause
severe eye injury.
(2)
Remove retainer rings (14), clevis pin (15),
and extend chain (16) from extend chain
clevis (17).
(a)
Loosen locknut (18) to reduce chain
tension during clevis pin removal.
(b)
Remove retainer rings (14) and clevis pin
(15) from extend chain clevis (17).
(c)
Separate extend chain (16) from clevis
(17).
TR00690
18-115
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |