|
|
TM 10-3930-673-20-1
Table 2-1. Unit Preventive Maintenance Checks and Services (Continued)
Location
Item
Item to Check/
No.
Interval
Service
Procedure
TR00939
Quarterly
Lubricate boom extend chain sheave with GAA as required.
Semiannually
Remove rear boom cover and check all visible boom wear pads (front
and rear). Refer to Para 18-20 for inspection procedures.
13
Annually
Truck, Forklift
Perform annual safety inspection in accordance with TB 43-0142,
Safety Inspection and Testing of Lifting Devices.
14
Quarterly
Coolant Mixture Check
Check for 50-50 mix of ethylene glycol and clean water. Refer to
MIL-A-46153. If necessary, drain and refill engine cooling system.
Refer to Para 7-2.
15
Semiannually
Fuel Filters
Replace primary and secondary engine fuel filters. Refer to Para 5-15.
16
Weekly
Wheels and Tires
Check wheel nuts for proper torque (330 +/- 5 lb-ft [637.2 +/- 7 Nm]).
Check tires for proper inflation pressures (front tires: 65 psi, rear tires
65 psi).
17
Axle Carrier
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |