TM 10-3930-660-24-2
MAIN CONTROL VALVE ASSEMBLY MAINTENANCE - CONTINUED
0303 00
ASSEMBLY - CONTINUED
14.
Install new O-ring (38) on body (37).
15.
Install new O-ring (33) on poppet (35). Install new back-up ring (34).
16.
Install poppet (36), poppet (35), piston (32) and spring (31) into body (37).
17.
Install new O-rings (28 and 30) onto plug (27).
29
27
25
32 30 28 26
24
18.
Install new back-up ring (29) onto plug (27). Install
37
plug assembly (27) into body (37).
36 34
38
19.
Install poppet (26), spring (25) and adjusting screw
20
(24).
31
20.
Install one new O-ring (23) into each nut (21 and 22).
33
21.
Install nuts (21 and 22).
35
21
22
22.
Install two relief valve assemblies (20) if removed.
23
23
409-1376
23.
Install new O-ring (19) on body (18).
24.
Install new O-ring (14) on poppet (13). Install back-up ring (15).
25.
Install poppet (17), poppet (16), piston (13) and spring (12) into body (18).
26.
Install new O-rings (9 and 11) onto plug (8).
14 12
10
8
11 9
15 13
16
27.
Install new back-up ring (10) onto plug (8). Install
1
plug assembly (8) into body (18).
17
28.
Install poppet (7), spring (6) and adjusting screw (5).
29.
Install one new O-ring (4) into each nut (2 and 3).
30.
Install nuts (2 and 3).
2
31.
Install two relief valve assemblies (1) if removed.
19
7
5
3
18
6
4
4
409-1375
32.
Install main control valve assembly (WP 0175 00).
33.
Install boom cylinder flow control valve (WP 0182 00).
34.
Operate boom, check for proper operation and leaks (TM 10-3930-660-10).
END OF WORK PACKAGE
0303 00-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |