|
|
TM 10-3930-660-24-2
BOOM EXTEND AND RETRACT CHAINS REPLACEMENT - CONTINUED
0267 00
EXTEND CHAIN REMOVAL - CONTINUED
4.
Remove nut (10) and flatwasher (11) from clevis (12).
Remove clevis (12) from its mounting hole near hose
tensioner.
5.
Remove extend chain (6).
6.
Tie a rope of suitable length to end of extend chain (6),
just behind clevis (12).
7.
Tie other end of rope to clevis (12) mounting hole.
NOTE
Leave rope inside boom after removing
extend chain. The rope will be used to pull
new extend chain through boom assembly.
8.
Pull extend chain (6) out from back of boom. Remove
rope from chain (6).
9.
Remove two retaining rings (13), pin (14) and clevis
(12). Separate extend chain (6) from clevis (12).
10
12
NOTE
11
14
6
13
409-1438
To retract chain, inner boom must be
removed.
RETRACT CHAIN REMOVAL
1.
Remove inner boom (WP 0263 00).
2.
Remove cotter pin (15) and clevis pin (16). Discard
16
INNER BOOM
cotter pin.
15
3.
Remove retaining ring (17), pin (18), clevis (19) to
disconnect retract chain (20). Remove retaining ring
(21) from pin (18), if necessary.
20
19
18
21
17
409-1439
0267 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |