Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-2
OUTER BOOM MAINTENANCE - CONTINUED
0264 00
INSTALLATION - CONTINUED
WARNING
Do NOT remove hydraulic tank filler cap or disconnect or remove any hydraulic system line or fitting
unless hydraulic system pressure has been relieved. Hydraulic system pressure can be over 3000 psi
(20685 kPa), even with engine and pump OFF. To relieve pressure, lower all hydraulic attachments to
the ground and shut down engine. Move control levers through all operating positions, then SLOWLY
loosen hydraulic tank filler cap. After maintenance, tighten all connections before applying pressure.
Escaping hydraulic fluid under pressure can penetrate the skin, causing injury or death.
Remove hose caps carefully prior to connecting lines in step 15. Hydraulic oil may be under pressure.
Failure to follow this precaution will cause personal injury.
14.
Connect three hoses (1) to three lines (4) at bulkhead
3
as tagged.
15.
Position hoses (2) on underside of outer boom (3) and
secure with four clamp halves (6), nut (7) and cap-
screw (5).
1
16.
Start engine and lower outer boom (3) until horizontal.
6
Stop engine (TM 10-3930-660-10).
6
4
17.
Install intermediate boom (WP 0263 00).
7
2
18.
Lubricate boom pivot pins and boom hoist cylinder
5
upper pivot pins.
19.
Operate boom and check for proper operation (TM 10-
3930-660-10).
409-1427
END OF WORK PACKAGE
0264 00-8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business