|
|
TM 10-3930-660-24-2
OUTER BOOM MAINTENANCE - CONTINUED
0264 00
INSTALLATION - CONTINUED
6.
Connect rod ends of boom hoist cylinders (8) to outer boom (3).
7.
Reposition slings to front of outer boom (3).
8.
Lift outer boom (3) until cylinder pivot pin holes of boom (3) are just above cab.
9.
Lift and support boom hoist cylinders (8).
NOTE
One boom hoist cylinder will begin to extend before the other. Install this cylinder first. Second cylinder will
begin to extend after first cylinder is connected.
10.
Start engine. Use joystick to extend boom hoist cylin-
der (8) until cylinder rod eye is aligned with pivot pin
hole of boom. Stop engine (TM 10-3930-660-10).
NOTE
Apply antiseize compound to pivot pin as
installed.
11.
Install and secure pivot pin (9) to outer boom (3) with
capscrew (10) and new locknut (11).
12.
Repeat steps 10 and 11 for other boom hoist cylinder
(8).
13.
Start engine and raise outer boom (3) as required for
access to lines (4). Stop engine (TM 10-3930-660-10).
10,11
9
3
8
409-1428
0264 00-7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |