Click here to make tpub.com your Home Page

Page Title: OUTER BOOM MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-2
OUTER BOOM MAINTENANCE
THIS WORK PACKAGE COVERS
Removal, Disassembly, Cleaning, Inspection, Assembly, Installation
INITIAL SETUP
Tools and Special Tools
Materials/Parts - Continued
Lockwasher (17 and 21)
Tool kit, general mechanic's (Item 39, WP 0324 00)
Wood block
Shop equipment, automotive (Item 21, WP 0324
References
Lifting device, 2,000 lb capacity
Materials/Parts
TM 10-3930-660-10
Cap and plug set (Item 8, WP 0323 00)
Compound, antiseize (Item 11, WP 0323 00)
Personnel Required
Two
Sealant, Loctite (Item 43, WP 0323 00)
Rag, wiping (Item 40, WP 0323 00)
Equipment Condition
Intermediate boom removed (WP 0263 00)
Locknut (11 and 14)
WARNING
Use caution when handling heavy parts. Provide adequate support and use assistance during procedure.
Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of heavy
parts supported only by lifting device. Failure to follow this warning may cause injury or death.
NOTE
Weight of the outer boom is 1,600 lb (726 kg).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business