TM 10-3930-660-24-2
INTERMEDIATE BOOM MAINTENANCE - CONTINUED
0263 00
ASSEMBLY
1.
If removal was necessary, install wear pads (WP 0267
WOOD BLOCK
00) inside intermediate boom (1).
2.
If removal was necessary, install boom hose pulley
retract chain sheave (WP 0191 00).
3.
If removal was necessary, install boom retract chain
sheave (WP 0193 00).
1
2
409-1422
INSTALLATION
NOTE
Center of gravity for intermediate boom is approximately 82 in. (208 cm) from front flange of boom. Posi-
tion hoist at center of gravity.
1.
Place a spreader bar under intermediate boom (1).
8
11
Hold spreader bar in place until hoist with slings is
installed.
2
2.
Use hoist or other suitable lifting device to install
9,10
intermediate boom (1) into outer boom (2). Slide the
intermediate boom (1) 1/4 of the way into outer boom
19
(2).
15
3.
Move hoist with slings to the front end of intermediate
16
boom (1).
17,18
22
14
21
12
13
409-1421
20
NOTE
All used wear pads installed in steps 5 thru 11 must be at least 3/8 in. (9.5 mm) thick. If wear pad is worn to
less than 3/8 in. (9.5 mm) thick, discard old wear pad and replace with new wear pad.
Adjust hoist and sling as required during steps 5, 8 and 11 to provide work room when installing wear pad
assemblies.
Shims are used as required. Install same quantity of shims as noted during removal.