Click here to make tpub.com your Home Page

Page Title: REMOVAL - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-2
INNER BOOM MAINTENANCE - CONTINUED
0262 00
REMOVAL - CONTINUED
2.
Remove retract chain pulley (4).
NOTE
Record the number of turns nut is loosened in step 3 for use during installation.
3.
Remove nut (5) and flatwasher (6) securing clevis (7). Remove clevis (7) from outer boom (2).
4.
Remove capscrew (8) and lockwasher (9). Remove pin (10) and chain pulley (4) from intermediate boom (11). Discard
lockwasher.
5.
Lift retract chain (12) through hole and over flange of
10
11
intermediate boom (11). This will allow retract chain
(12) to fall freely when inner boom is removed.
6.
Loosen four nuts (19) at tensioner (20) to relieve ten-
sion on hoses (13 thru 15).
7.
Tag and disconnect hoses (13 thru 15) from lines (16
2
thru 18).
7
5,6
12 4
8.
Close end of lines (16 thru 18) with metal plugs.
8,9
20
19
16,17,18
13,14,15
409-1404
0262 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business