|
|
TM 10-3930-660-24-2
INNER BOOM MAINTENANCE - CONTINUED
0262 00
REMOVAL - CONTINUED
2.
Remove retract chain pulley (4).
NOTE
Record the number of turns nut is loosened in step 3 for use during installation.
3.
Remove nut (5) and flatwasher (6) securing clevis (7). Remove clevis (7) from outer boom (2).
4.
Remove capscrew (8) and lockwasher (9). Remove pin (10) and chain pulley (4) from intermediate boom (11). Discard
lockwasher.
5.
Lift retract chain (12) through hole and over flange of
10
11
intermediate boom (11). This will allow retract chain
(12) to fall freely when inner boom is removed.
6.
Loosen four nuts (19) at tensioner (20) to relieve ten-
sion on hoses (13 thru 15).
7.
Tag and disconnect hoses (13 thru 15) from lines (16
2
thru 18).
7
5,6
12 4
8.
Close end of lines (16 thru 18) with metal plugs.
8,9
20
19
16,17,18
13,14,15
409-1404
0262 00-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |