Click here to make tpub.com your Home Page

Page Title: REMOVAL
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-2
INNER BOOM MAINTENANCE - CONTINUED
0262 00
CAUTION
Wipe the area clean around all hydraulic connections to be opened during removal and disassembly. Cap oil
lines and plug holes after removing lines. Contamination of the hydraulic system could result in premature
failure.
NOTE
If more than one hydraulic line is to be removed, identify lines to assure proper installation. Use suitable
container to catch any hydraulic oil that may drain from system.
Combined weight of outer boom weldment and boom extend cylinder is approximately 1,500 lb (680
kg).
REMOVAL
NOTE
Count and record number of turns nut is loosened in step 1.
1.
Loosen, but do not remove nut (1) on underside of
outer boom (2) to relieve tension on extended chain
(3).
WOOD BLOCK
2
409-1403
1
3
0262 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business