Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-2
FLYWHEEL MAINTENANCE - CONTINUED
0214 00
INSTALLATION - CONTINUED
6.
Apply loctite to threads of capscrews (5).
7.
Install 10 in. coupling (7), new lockwashers (6) and
capscrews (5). Torque to 25 lb-ft (34 Nm) and let set
for 24 hours before operating engine.
6
5
7
409-964
8.
Install flywheel housing cover (4), ether start thermo-
stat ground wire (3), and six new lockwashers (2) and
capscrews (1).
1,2
4
3
409-963
9.
Install starting motor (WP 0064 00).
10.
Install engine (WP 0209 00 or WP 0210 00).
11.
Operate engine, check for proper operation and leaks (TM 10-3930-660-10).
END OF WORK PACKAGE
0214 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business