|
|
TM 10-3930-660-24-1
BOOM WEAR PADS INSPECTION - CONTINUED
0190 00
INSPECTION - CONTINUED
14.
Start engine (TM 10-3930-660-10).
15.
Fully extend inner boom (5).
16.
Stop engine (TM 10-3930-660-10).
17.
Use lifting device to move inner boom (5) up and down and from side to side. Check for clearance of 0.01 to 0.13 in.
(0.254 to 3.302 mm) between wear pads and surfaces of inner and intermediate booms. Remove lifting device after mea-
suring clearance.
18.
Start engine (TM 10-3930-660-10).
19.
Fully extend intermediate boom (3).
20.
Stop engine (TM 10-3930-660-10).
21.
Use lifting device to move intermediate boom (3) up and down and from side to side. Check for clearance of 0.01 to
0.13 in. (0.254 to 3.302 cm) between wear pads and surfaces of intermediate and outer booms.
NOTE
If clearances measured in steps 17 and 21 are not within limits, wear pads are worn or quantity of wear pad
shims is incorrect. Refer to WP 0266 00).
END OF WORK PACKAGE
0190 00-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |