Click here to make tpub.com your Home Page

Page Title: INSPECTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-1
BOOM WEAR PADS INSPECTION - CONTINUED
0190 00
INSPECTION - CONTINUED
Measure thickness of wear pads (1). If worn refer to Boom Wear Pads Replacement, (WP 0266 00).
5.
6.
Inspect wear pads (4) at rear of intermediate boom (3) and inner boom (5).
1
3
2
4
409-727
4
409-730
7.
Start engine (TM 10-3930-660-10).
8.
Fully retract boom sections.
9.
Stop engine (TM 10-3930-660-10).
10.
Remove four screws (6), four lockwashers (7) and boom cover (8) from outer boom (2) to provide access. Discard lock-
washers.
Measure thickness of wear pads (4). If worn, refer to Boom Wear Pad Replacement, WP 0266 00.
11.
2
5
8
4
7
6
4
409-728
409-729
NOTE
Apply loctite to threads of screws.
12.
Install cover (8) to outer boom with four new lockwashers (7) and four screws (6).
13.
If necessary, check for proper wear pad clearances.
0190 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business