|
|
TM 10-3930-660-24-1
MLRS ATTACHMENT REPLACEMENT - CONTINUED
0188 00
REMOVAL
1.
Disconnect boom electrical cable leads (1) at junction
box (2) and remove boom electrical cable (3).
55 54
56
53
57
2.
Loosen four screws (4) and separate cover (5) from
box (2).
58
71
NOTE
6
Only disconnect electrical leads of boom
02
electrical cable during steps 3 thru 5. Do not
disconnect any other electrical leads inside
7
box during these steps.
52
51
Tag screw terminals on terminal strips as
electrical leads are removed for use during
installation. Note that terminals on strips and
are not marked.
3.
Loosen screws on strip (6) and remove electrical leads
58, 57, 56, 55, 54, 53 and 71 at top terminal strip of
box (2).
3
10
4.
Loosen screw on strip (6) and remove electrical lead
2
02 at bottom of terminal strip.
5.
Loosen screws on strip (7) and remove electrical leads
51 and 52, at bottom terminal strip of box (2).
1
6.
Loosen screws on strip (8) and remove leads 50, 64,
and 65 at terminal strip on auto leveler circuit board
(9).
5
7.
Cut two tie down straps (10) where cable (3) enters
box (2). Discard tie down straps.
4
9
GND A B
VS
8
50
64
65
409-716
0188 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |