Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-1
BOOM CYLINDER FLOW CONTROL VALVE REPLACEMENT - CONTINUED
0182 00
INSTALLATION
NOTE
Remove caps and plugs as hoses are installed. Wipe all sealing surfaces on valve and hoses clean and dry.
8
8
1.
Connect flow control valve (4) into reducer (5) of
main control valve (6) and tighten securely.
2.
Connect hydraulic hoses (3) as tagged.
3.
Connect hydraulic hose (3) to fitting (7).
4.
Connect hoses (1) and (2) to flow control valve (4).
4
7
5.
Tighten all fittings (8) securely.
1
2
409-4068
3
6.
Install transmission cover (WP 0150 00).
NOTE
It is possible that the hydraulic pumps have air in the pump cavities. This air must be purged from the cavity
before the pump will operate.
7.
Start engine, check for leaks and proper operation (TM 10-3930-660-10).
8.
Purge air from hydraulic circuit by raising and lowering boom five times.
9.
Stop engine and relieve hydraulic pressure by operating boom raise and lower controls (TM 10-3930-660-10).
END OF WORK PACKAGE
0182 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business