|
|
TM 10-3930-660-24-1
MAIN CONTROL VALVE MAINTENANCE - CONTINUED
0175 00
INSTALLATION
1.
Position control valve (7) on compartment wall.
NOTE
9
7
8
Apply loctite to threads of capscrews.
2.
Place a capscrew (6) through compartment wall and
valve flange (8). Place a new lockwasher (5) and a nut
(4) on end of capscrew. Hand-tighten nut.
3.
Place remaining two capscrews through compartment
wall and valve flanges (9 and 10) and secure with new
lockwashers (5) and nuts (4).
4.
Tighten all nuts (4).
10
409-4067
5.
Remove caps from all hydraulic hoses (1) and tube
3
(2).
6.
Connect thirteen hydraulic hoses (1) and one tube (2)
to fittings (3).
2
7.
Start engine (TM 10-3930-660-10).
8.
Cycle boom hoist and extend functions five times.
4,5,6
4,5,6
9.
Shut off engine and check for leaks (TM 10-3930-660-
7
10).
3
1
409-655
10.
Install transmission cover (WP 0150 00).
0175 00-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |