|
|
TM 10-3930-660-24-1
BATTERY BOX AND COVER MAINTENANCE - CONTINUED
0108 00
INSTALLATION - CONTINUED
16.
Position STE/ICE-R electrical lead (16) on terminal
12
11
(D) of STE/ICE shunt (1) as tagged during removal
and secure with flatwasher (15), new lockwasher (14)
10
and screw (13).
9
1
17.
Position STE/ICE-R electrical lead (16) on terminal
(C) of STE/ICE-R shunt (1) as tagged during removal
and secure with flatwasher (11), new lockwasher (10)
C
and screw (9).
D
2
15 16
13
14
409-403
18.
Position ground cable (8) on terminal (B) of STE/ICE-
5
R shunt (1) as tagged during removal and secure with
new lockwasher (7) and capscrew (6).
1
4
19.
Position short end of negative battery cable (5) on ter-
minal (A) of STE/ICE-R shunt (1) as tagged during
3
2
removal and secure with new lockwasher (4) and cap-
A
screw (3).
B
7
6
8
409-395
20.
Install batteries (WP 0106 00).
END OF WORK PACKAGE
0108 00-6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |