Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-1
BATTERY BOX AND COVER MAINTENANCE - CONTINUED
0108 00
INSTALLATION - CONTINUED
29
28
8.
Position STE/ICE-R shunt (1) on battery box (2).
27
9.
Secure STE/ICE-R shunt (1) to battery box (2) with
two nuts (29), two flatwashers (28) and two capscrews
1
(27).
10.
Position battery box (2) on mounting studs (26) at
back of cab.
2
409-406
11.
Secure battery box (2) to mounting studs (26) with
26
four washers (25) and four new locknuts (24).
25
24
2
409-405
NOTE
Insert electrical leads and cables through hole at base of battery box prior to performing step 13.
12.
Position negative battery cable (5) on negative termi-
22
19 23
nal (F) of slave receptacle (19).
13.
Secure negative battery cable (5) to negative terminal
(F) with capscrew (22) and new starwasher (23).
20 21
14.
Position positive emergency steering pump power
5
cable (18) and positive battery cable (17) on positive
F
E
terminal (E) of slave receptacle (19).
15.
Secure cables (18) and (17) with capscrew (20) and
18
17
new starwasher (21).
409-404
0108 00-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business