|
|
TM 10-3930-660-24-1
STE/ICE-R SHUNT REPLACEMENT - CONTINUED
0090 00
INSTALLATION - CONTINUED
4.
Position STE/ICE-R electrical lead (10) at terminal (15) of STE/ICE-R shunt (3). Secure electrical lead to terminal with
flatwasher (14), new lockwasher (13) and screw (12).
5.
Install ground cable (2) and negative battery cable (1)
1
to STE/ICE-R shunt (3).
11
6.
Position ground cable (2) at terminal (9) of STE/ICE-
5
R shunt (3). Secure ground cable to terminal with new
lockwasher (8) and capscrew (7).
4
3
7.
Position negative battery cable (1) at terminal (6) of
6
STE/ICE-R shunt (3). Secure negative battery cable to
terminal (6) with new lockwasher (5) and capscrew
9
(4).
7
8
2
409-347
8.
Install batteries (WP 0106 00).
END OF WORK PACKAGE
0090 00-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |