Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-1
BOOM ELECTRICAL JUNCTION BOX ASSEMBLY REPLACEMENT - CONTINUED
0085 00
INSTALLATION - CONTINUED
5.
Carefully position cable (15) through hole in box
15
assembly (1).
16
6.
Secure cable on both sides of hole with two new tie
down straps (16).
1
409-329
7.
Place leads (12) on terminal strips (13) inside box
12,13,14
1
assembly (1).
8.
Tighten screws (14) on terminals strips (13) to secure
leads (12).
8
9.
Connect four electrical leads (8) at auto leveler circuit
board (7).
9
10.
Place four leads (8) on terminals strip (10) inside box
10,11
assembly (1).
11.
Tighten four screws (11) on terminal strip (10) to
secure leads (8).
6
7
409-328
0085 00-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business