Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-1
CIRCUIT BREAKERS REPLACEMENT - CONTINUED
0071 00
INSTALLATION - CONTINUED
1.
From outside of cab (9), install two screws (12).
NOTE
Apply loctite to threaded ends of screws.
2.
From inside of cab (9), position bracket (8) on threaded ends of two screws (12). Secure bracket (8) with two new lock-
washers (11) and two nuts (10).
3.
Install circuit breakers (6) to bracket (8) as tagged. Refer to steps 5 and 6 below.
4.
Install circuit breaker (6) by pushing circuit breaker (6) straight into bracket (8) until circuit breaker (6) snaps into place.
NOTE
Install wire leads to circuit breaker terminals as tagged.
5.
Position wire lead (7) onto circuit breaker (6). Secure with two nuts (4) and two new lockwashers (5).
NOTE
Apply loctite to threads of capscrews.
6.
Position access cover (2) on base of operator console
(3) and secure with four capscrews (1).
7.
Connect battery cables (WP 0107 00).
1
2
3
409-278
END OF WORK PACKAGE
0071 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business