|
|
Replace the carriage by the procedure given in Section 10
in this manual.
Fig. 16443
When the carriage has been replaced, operate the upright and
note unusual operation.
Make operational checks and load test the upright before
placing the truck in service.
This completes the procedure for measuring rail-to-roller
clearance and the adjustment of rail-to-to roller clearance.
Work safely.
Be sure to keep rails blocked during upright disassembly and
re-assembly.
Fig. 16444
5-193
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |