|
|
. . . then lower the carriage. Remove the safety blocks at
the steer wheels.
Operate the upright several times to be sure it is operating
properly.
Make operational checks and load test before placing the
truck in service.
This concludes the service procedure for making operational
checks, the load testing, and carriage adjustments on the
t r i p l e stage upright with six-roller carriage. The
following section list the procedures for making rail
adjustments on the triple stage upright.
5-151
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |