Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-644-14&P
the differential carrier flange. Insert capscrews
20-24 lb-ft LUBRICATED THREADS.
and tighten them to specified torque of 25-30 lb-
ft DRY THREADS, or 20-24 lb-ft LUBRICATED
NOTE
THREADS.
Make certain ALL CAPSCREWS are
tightened to SPECIFIED TORQUE.
3. Position transmission end of u iversal joint so
n
holes in cross assembly align with holes in
4. Remove blocks supporting the lift truck and
output flange.  Insert capscrews and tighten
lower the truck to the floor.
them to specified torque of 25-30 lb-ft DRY
THREADS, or
3-120
3-133

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business