Click here to make tpub.com your Home Page

Page Title: TOPIC 3. LIFT CYLINDERS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-644-14&P
TOPIC 3. LIFT CYLINDERS
A. GENERAL
3. Remove  the  crosshead  assembly,  ram
The hydraulic oil enters the lift cylinder at or near the
protecting rod, chain and guard from cluster
base of the cylinder causing the plunger to extend.
cylinder assembly.
A flow regulator, located at the oil inlet port of the lift
4. Remove  cylinder  cluster  retaining  nut  (or
cylinder, controls the outflow of hydraulic oil so that the
retaining plate as applicable) at bottom of outer
load lowers at a controlled rate of speed from the raised
mast.
position.
5. Remove the capscrews.
B. MAINTENANCE
.spacers at the top of the Inner mast upright.
1. 50 Hour Inspection
6. Carefully remove the cylinder cluster from the
After each 50 hours of operation, inspect the
outer and inner masts.
mast lift cylinder, cylinder hoses, and fittings for
evidence of leaks and repair as necessary.
NOTE
Refer  to  REPAIR  MANUAL  for
2. 100 Hour Inspection
DISASSEMBLY,  INSPECT:
ON,
REPAIR and REASSEMBLY.
After each 0l0 hours o operation, wipe oil and
f
foreign matter from lift chains and inspect them
D.
LIFT  CYLINDER-CLUSTER
INSTALLATION
for bent or cracked links. Use a I" paint brush
(20-55 SERIES)
and lubricate both sides of chains with SAE 20
engine oil. Wipe off excess oil with a clean rag.
CAUTION
If chains are loose or carriage is not level, the
Prior to lift cylinder installation, be
chains must be adjusted.  (Refer to following
certain that all hoses and fittings are
Paragraph E. LIFT CHAIN ADJUSTMENT.)
clean and that there is no foreign
matter in the cylinder inlet port.
3. 500 Hour Inspection
1. install all fittings and clamps previously removed
Approximately every 500 hours of operation,
from cylinder, and install the low regulator.
remove the lift chains from mast assembly and
clean them in an oil solvent solution (50% SAE-
2. To install the cylinder cluster assembly, first
30 nondetergent engine oil and 50% suitable
ensure that the crosshead assemblies and ram
cleaning solvent).  Soak chains in oil-solvent
protectors have been correctly installed at the
solution for about four (4) hours and agitate then
outer cylinder rims, and that the chair adjusting
several  times  during  the  soaking  period.
screws and locknuts have been installed.
Remove chains from oil solvent and wipe off all
of the cleaning solution.  Inspect lift chains for
3. Attach a properly rated hoist chain to the
wear and broken or cracked links.  Replace
cylinder cluster assembly and maneuver cluster
entire chain if any links are broken or cracked.
assembly into its relative mounting position
Install the chains; then use a 1" paint brush and
within the inner and outer masts.
lubricate both sides of chains with SAE-20
engine oil.  Wipe off excess oil with a clean
4. Install attaching capscrews and lockwashers
cloth. Adjust chains so fork carriage is level and
which secure the cylinder cluster to inner mast.
all slack is removed from the lift chains.
Tighten mounting capscrews.
5. install  and  reconnect
the
cylinder
cluster
C. LIFTCYLINDER-CLUSTER REMOVAL (20-55
adjusting screws.
SERIES)
1. With lift cylinders fully retracted and carriage
resting on ground, disconnect lift chains from
NOTE
cylinder cluster.
Refer to LIFT CHAIN ADJUSTMENT
2. Disconnect  hydraulic  hoses,  and  fittings
Paragraph E of this Topic, prior to
(including flow-regulator), and plug or cap all
operational use of lift truck.
hydraulic openings to prevent entry of any
2-99

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business